Construction project management in WordPress. Change orders, costs, G702/G703.
One job, seven months in: Northwind Technology Center Phase 2, a $15.7M fit-out. 10 RFIs and 10 submittals at mixed statuses, a 15-line schedule of values, and 173 rows of activity trail. The record worth opening is COR-014: a complete change-order chain from the potential change through the owner’s direction, the directive, the subcontractor’s proposal and the owner’s approval. Every step was taken through the plugin’s own API by the party the workflow requires, so the timeline names the right person at each one.
What to look at
Logins
- Admin, read-only —
viewer.demo / ibuilder-demo-viewer(every admin screen opens; saving is refused) - GC administrator —
gc.demo / ibuilder-demo-gc - Owner —
owner.demo / ibuilder-demo-owner - Subcontractor —
sub.demo / ibuilder-demo-sub - Architect —
architect.demo / ibuilder-demo-arch
What this demo does not show
Sign in as the subcontractor and then as the GC. The dual-role model — a CRUD role and a party role, with a per-section access matrix — is the architecture of this product, and it is invisible from a single account. The IFC 3D viewer is left off, because it is off by default and needs libraries the buyer self-hosts.
