Scheduled: what we learned seeding a demo site
Going out on Thursday. Queued, not yet sent — the schedule lives in WordPress, not on LinkedIn.
Going out on Thursday. Queued, not yet sent — the schedule lives in WordPress, not on LinkedIn.
Per-seat, deactivatable, no phone-home on every boot. It is not complicated, and it is not what most tools do.
Six trades, five floors, one picture that shows where the crews will collide.
Idempotent imports, de-listing, and why the field map matters more than the adapter.
Four hundred plates, eleven types, three revisions after the room numbers changed. Here is the schedule format we settled on.
Profitable and short of cash is the most common way a small contractor fails. Three months of books is enough to see it coming.
A slab edge drawn flush, an embed plate projecting two and a half inches, and nobody looking at both sheets at once. What we changed about our drawing review afterwards.
Seven months of a $15.7M fit-out, and the single biggest saving was not a product. It was deciding that a change order is a record with a state, not a thread with attachments.